Revolutionary HDD Performance: Drillto ZT-300A Conquers Challenging River Crossing Project
Completed high-difficulty river crossing project with stable performance under complex construction conditions.
Professional HDD solution for your critical projects.

Dedicated Transmission Line for Huaneng Nantong H-class
Power Plant Pipeline Construction Project of the Chongchuan Section

The 900-meter Heavy Sand
508mm Steel Pipe River Crossing Project

There exists substantial signal interference, numerous underground pipeline obstacles and a complex layout of the existing pipelines.

This represents an unseen crossing
Yet a palpable battle.