How efficient are trenchless drilling machines?

Aug 21, 2025|

I. Construction Efficiency Comparison
1. Horizontal Directional Drill
200-meter pipeline crossing completed in just 6 hours (traditional excavation takes several days)
Suitable for municipal projects, avoiding damage to newly built roads and green spaces
2. Fence Drill
Drilling time per hole: 3-5 minutes (18-25 minutes for manual drilling), 2-6 times higher efficiency
80-100 holes completed per day (30 for manual drilling)
3. Bracket-Mounted Diesel Drill
Drilling time per hole: 25 minutes (1 hour and 45 minutes for manual drilling), 4 times higher efficiency
35 holes completed per day (8 for manual drilling), 50% lower overall costs
II. Key Factors for Efficiency Improvement
1. Mechanized Power
Diesel Drill Rig: 15 hp Power engine + alloy drill bit significantly increases speed.

A spiral drill bit design reduces resistance in hard soil (e.g., the GLP-150 drill has a torque of 7840 N·m).

2. Intelligent Guidance Technology.

Magnetic compass accuracy is ≤1 meter per 100 meters, reducing correction time.

3. Standardized Operation.

Single-operator operation reduces labor reliance (e.g., the average daily wage for a diesel driller is 300 yuan).

III. Typical Application Scenarios.

1. Municipal Engineering.

Horizontal directional drilling rigs for pipeline crossings (e.g., the GLP-150 drill rig reaches a depth of 50 meters).

2. Fence Reinforcement.

The drill rig completes an average of 200 holes per day (requiring 4 people for 3 days).

3. Foundation Reinforcement.

The verticality error of the bracket-type drilling rig is ≤1°, providing superior quality compared to manual drilling.

What are the main components of Trenchless Drilling Machine?

Send Inquiry