Jun 05, 2024| 1. Site preparation: Level and compact the site before construction, remove obstacles and soft soil layers, and ensure a solid foundation.
2. Equipment selection: Select a drilling rig with appropriate tonnage and performance according to the construction geological conditions and engineering requirements to ensure that it has sufficient stability and carrying capacity.
3. Support and anchoring: Correctly set the support legs of the drilling rig and effectively anchor them to increase the contact area and friction with the ground.
4. Drilling parameter control: Reasonably control parameters such as drilling speed, torque, thrust, etc. to avoid excessive impact force causing the drilling rig to shake.
5. Guidance accuracy: Ensure the accuracy of the guidance system, make the drilling trajectory meet the design requirements, and reduce instability caused by deviation.
6. Drill rod quality: Use high-quality, high-strength and straight drill rods to prevent the bending or deformation of the drill rod from affecting the stability of the drilling rig.
7. Monitoring and adjustment: Continuously monitor the posture and stability of the drilling rig during the construction process, and make timely adjustments when abnormalities are found.
8. Geological survey: fully understand the geological conditions of the construction area and take corresponding reinforcement or treatment measures in advance.
9. Regular maintenance: perform regular maintenance and care on the drilling rig to ensure that all components work properly and have stable performance.
10. Operator training: improve the skill level and safety awareness of operators so that they can operate proficiently and respond to emergencies.