The ZT-55/110CDF Drilling Rig Was Used For A River-crossing Power Pipeline Project.

Aug 21, 2025|

River-crossing power pipeline projects are challenging projects that require overcoming numerous difficulties. The 300-meter-wide river posed a significant challenge for laying the power pipeline. However, with a powerful rig like the ZT-55/110CDF, we were able to easily overcome this difficulty and ensure the pipeline was laid smoothly across the river.

2db0abc8-1692-4768-977a-905b049851b1

The 12-hole power pipeline, totaling 400 meters, required precise control and operation to ensure safe and smooth operation. The ZT-55/110CDF, as a professional pipe-drawing machine, enabled us to achieve precise pipe-drawing operations and ensure smooth pipeline laying.

Even with heavy riverbed sand, we didn't have to worry. With the help of the ZT-55/110CDF, we were able to successfully overcome this obstacle and lay the power pipeline.

bf21f45d-9761-4817-b071-351595721f92
de5876ef-27a2-4391-aa55-60f9a92673cd

 

 